A New or properly reconstructed asphalt tennis court should be graded and sloped to a tolerance as seen above. After a rain storm water accumulation should be minimal, well dispersed and drain off the court swiftly.
Site Planning considerations:
1. Proper dimensions and spacing between and around courts, particularly on irregular or limited sites or where liability issues are a special concern;
2. Orientation of courts, site layout & planning;
3. Drainage including slope and drainage of courts, site drainage and storm water management;
4. Soil issues, base construction;
5. Evaluating surfacing options;
6. General information, advice and comparison of accessories and amenities;
7. Climatic considerations;